Scheduling Parameter on Maintenance Order

Pada setting scheduling parameter, kita dapat menentukan bagaimana basic dates / basic finish dapat disesuaikan dengan time scheduling.

Secara sheduling type, terdiri dari :

  • Forwards (adjust basic finish)
  • Backwards (adjust basic start)
  • Only capacity requirements
  • Current date
  • Forwards in time (paling sering digunakan)
  • Backwards in time

Sedangkan secara Adjust scheduling, ada 4 setting yang dapat digunakan :

Adjust basic dates, adjust dependent requirement to operation date

Do Not adjust basic dates, adjust dependent requirement to operation date

Adjust basic dates, adjust dependent requirement to order start

Do not adjust basic dates, adjust dependent requirement to order start

semoga bermanfaat 🙂

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s